The Given the example of one 100m high rock slop on the power station, The integrated projection on equator plane and ultimate balance method is introduced. 以某电厂高100m以上岩石高边坡为例,介绍了采用赤平投影图解法及极限平衡法,进行岩体边坡稳定性分析的方法。
The data processing includes map projection transformation, image enhancement both on contrast stretch and image sharpening, color balance adjustment, cloud removing, separated processing of land and sea, modification of image seasonal aspect with vegetation index image and mosaic. 本图制作时实施的数据处理内容包括:地图投影变换、影象反差增强和锐化、彩色平衡调整、去云处理和海陆分离处理、利用植被指数原理的影象时相修正和数字镶嵌操作等。